Question 460
A Cisco ACI change review investigates: An intended APIC application EPG does not appear as a distributed port group. Observed evidence: The EPG lacks an association to its VMware vCenter VMM domain. Which architectural or operational principle BEST applies?
Explanation
Correct Answer
VMware DVS integration requires a supported authenticated controller and correct EPG-to-VMM domain attachment. The recorded evidence is: The EPG lacks an association to its VMware vCenter VMM domain. The corresponding action is: Correct the EPG-to-VMM-domain relation using supported APIC integration.
Incorrect Answers
This alternative invokes: APIC logs show authentication rejection despite network reachability. Appropriate ACI operational principle: Nutanix VMM integration depends on current controller authorization and correct host fabric-domain links. The governing distinction for the recorded case is VMware DVS integration requires a supported authenticated controller and correct EPG-to-VMM domain attachment.
That principle concerns another fact pattern: Graph state identifies the failed node while inspection remains a policy obligation. Appropriate ACI operational principle: ACI service graphs require coherent L4-L7 device, connector and contract associations across intended traffic paths. Here the key fact is: The EPG lacks an association to its VMware vCenter VMM domain.
A different principle is: APIC deployment faults identify missing logical device connectors. Appropriate ACI operational principle: ACI service graphs require coherent L4-L7 device, connector and contract associations across intended traffic paths. The present evidence, however, is the EPG lacks an association to its VMware vCenter VMM domain. The relevant rule is: VMware DVS integration requires a supported authenticated controller and correct EPG-to-VMM domain attachment.
Question 461
In a deliberately RELATED second view of the same fictional ACI problem: An intended APIC application EPG does not appear as a distributed port group. Which evidence-action-proof sequence is most defensible?
Explanation
Correct Answer
The starting point is the EPG lacks an association to its VMware vCenter VMM domain. The proposed action and its separate check are Correct the EPG-to-VMM-domain relation using supported APIC integration and the corresponding DVS port group appears and a VM attaches correctly, respectively.
Incorrect Answers
Another action-and-check pairing is: Inspect the observed evidence: Resource telemetry reveals unexpected deployment across the wide VMM domain. Apply the controlled action: Scope resolution and deployment immediacy to host placement and readiness needs. Validate the separate result: Required VM start behavior works with fewer unintended leaf allocations. The evidence here is the EPG lacks an association to its VMware vCenter VMM domain. The required action and proof are Correct the EPG-to-VMM-domain relation using supported APIC integration and the corresponding DVS port group appears and a VM attaches correctly.
A different plan would inspect the observed evidence: APIC reports a TLS trust failure while existing VMs keep running. Apply the controlled action: Validate the new controller certificate and supported authenticated VMM connection. Validate the separate result: APIC resumes VMware DVS inventory and policy synchronization. It does not test the case-specific condition: The EPG lacks an association to its VMware vCenter VMM domain.
Another combination would inspect the observed evidence: Object dependencies show active applications still using the retiring VMM domain. Apply the controlled action: Migrate surviving associations before removing obsolete controller and domain records. Validate the separate result: Remaining workloads stay connected and the retired controller is absent. The current record instead supports Correct the EPG-to-VMM-domain relation using supported APIC integration, verified by the corresponding DVS port group appears and a VM attaches correctly.
Question 462
An ACI team must address: An intended APIC application EPG does not appear as a distributed port group. Which corrective action AND independent verification make the BEST pair?
Explanation
Correct Answer
The starting point is the EPG lacks an association to its VMware vCenter VMM domain. The proposed action and its separate check are Correct the EPG-to-VMM-domain relation using supported APIC integration and the corresponding DVS port group appears and a VM attaches correctly, respectively. For the current case, the offered answer is Correct the EPG-to-VMM-domain relation using supported APIC integration. Independently observable proof: The corresponding DVS port group appears and a VM attaches correctly.
Incorrect Answers
Another potential sequence is: Validate deployment immediacy against documented first-flow requirements. Independently observable proof: Contract programming occurs at the intended time and authorized packets pass. It has no direct link to the distinguishing evidence: The EPG lacks an association to its VMware vCenter VMM domain.
Another action-and-check pairing is: Activate the approved service-node failover or redundancy design. Independently observable proof: Applications recover through another authorized inspected path. The evidence here is the EPG lacks an association to its VMware vCenter VMM domain. The required action and proof are Correct the EPG-to-VMM-domain relation using supported APIC integration and the corresponding DVS port group appears and a VM attaches correctly.
Another possible combination is: Bind the approved VMM domain to the correct host-facing access policy. Independently observable proof: A test VM learns under its intended EPG on the attached leaf. The current record instead supports Correct the EPG-to-VMM-domain relation using supported APIC integration, verified by the corresponding DVS port group appears and a VM attaches correctly.
Question 463
While implementing this supported-intent ACI correction: Correct the EPG-to-VMM-domain relation using supported APIC integration. Which material security or operational caveat matters most?
Explanation
Correct Answer
The risk to retain is: Manually adding similar-named port groups can obscure missing policy. The original evidence is the EPG lacks an association to its VMware vCenter VMM domain; widening the change beyond it is not justified.
Incorrect Answers
Another emphasis concerns: Binding it to an overly broad contract can redirect unrelated users. The current change is Correct the EPG-to-VMM-domain relation using supported APIC integration; the material limitation is Manually adding similar-named port groups can obscure missing policy.
This limitation concerns another setting: Treating the problem as an application restart fault conceals fabric mapping. The observed facts here make a different caution decisive: Manually adding similar-named port groups can obscure missing policy.
Another caution is: Associating every domain indiscriminately may expose unauthorized VLANs. The key risk in this case is: Manually adding similar-named port groups can obscure missing policy.
Question 464
In the related Cisco ACI scenario: An intended APIC application EPG does not appear as a distributed port group. Which focused diagnostic AND post-change acceptance evidence BEST demonstrate resolution?
Explanation
Correct Answer
The focused investigation should compare case-specific ACI object and operational records with this deciding evidence: The EPG lacks an association to its VMware vCenter VMM domain. Success criterion: The corresponding DVS port group appears and a VM attaches correctly. It is tied to the observed evidence: The EPG lacks an association to its VMware vCenter VMM domain. It tests the conditions for this response: Correct the EPG-to-VMM-domain relation using supported APIC integration.
Incorrect Answers
That check concerns a different signal: Compare case-specific ACI object and operational records with this deciding evidence: The active EPG contract subject has no service graph association. Success criterion: Only intended application traffic traverses the load balancer. The case-relevant check is: Compare case-specific ACI object and operational records with this deciding evidence: The EPG lacks an association to its VMware vCenter VMM domain. Success criterion: The corresponding DVS port group appears and a VM attaches correctly.
Another check would compare case-specific ACI object and operational records with this deciding evidence: APIC deployment faults identify missing logical device connectors. Success criterion: Application traffic uses the new device and old references disappear. The case observation to isolate is the EPG lacks an association to its VMware vCenter VMM domain. The focused check here is: Compare case-specific ACI object and operational records with this deciding evidence: The EPG lacks an association to its VMware vCenter VMM domain. Success criterion: The corresponding DVS port group appears and a VM attaches correctly.
That check concerns a different signal: Compare case-specific ACI object and operational records with this deciding evidence: The VMM configuration uses on-demand deployment and hardware programming follows traffic. Success criterion: Contract programming occurs at the intended time and authorized packets pass. The case-relevant check is: Compare case-specific ACI object and operational records with this deciding evidence: The EPG lacks an association to its VMware vCenter VMM domain. Success criterion: The corresponding DVS port group appears and a VM attaches correctly.
Question 465
A fictional Cisco ACI engineering project has this problem: A Nutanix VMM integration stops updating workloads after its API credentials rotate. Diagnostic observation: APIC logs show authentication rejection despite network reachability. Which scoped engineering response is BEST?
Explanation
Correct Answer
The observed condition is: APIC logs show authentication rejection despite network reachability. This calls for the scoped change: Update the least-privilege supported Nutanix VMM controller authentication. The acceptance measure is: Inventory sync and controlled network deployment resume.
Incorrect Answers
A different alternative is: Validate deployment immediacy against documented first-flow requirements. It does not establish the necessary outcome: Inventory sync and controlled network deployment resume.
Another proposed action is: Correct supported service graph connectors and bidirectional flow policy. It targets a different dependency; the evidence here is APIC logs show authentication rejection despite network reachability.
Another option proposes: Validate the new controller certificate and supported authenticated VMM connection. The specific correction is: Update the least-privilege supported Nutanix VMM controller authentication. The deciding evidence is: APIC logs show authentication rejection despite network reachability.
Question 466
An ACI implementation encounters: A Nutanix VMM integration stops updating workloads after its API credentials rotate. Which technical evidence BEST identifies the particular failure?
Explanation
Correct Answer
APIC logs show authentication rejection despite network reachability. That fact identifies the relevant dependency, rather than a separate issue. Nutanix VMM integration depends on current controller authorization and correct host fabric-domain links.
Incorrect Answers
Another proposed finding is: Decisive observed evidence: Graph state identifies the failed node while inspection remains a policy obligation. It is not the recorded discriminator, which is APIC logs show authentication rejection despite network reachability.
That other evidence is: The active EPG contract subject has no service graph association. The current incident instead shows: APIC logs show authentication rejection despite network reachability. This distinction supports the action: Update the least-privilege supported Nutanix VMM controller authentication.
That alternative considers the following evidence: Recovery tests show gateway policy installation lagging the first VM boot as decisive. The actual evidence in this case is APIC logs show authentication rejection despite network reachability.
Question 467
An engineer proposes this ACI correction: Update the least-privilege supported Nutanix VMM controller authentication. Which independently observable outcome BEST verifies it?
Explanation
Correct Answer
Confirm the correction by demonstrating: Inventory sync and controlled network deployment resume. This directly tests the intended change, Update the least-privilege supported Nutanix VMM controller authentication.
Incorrect Answers
Passing that test would not establish resolution of the stated issue. The relevant proof is: Inventory sync and controlled network deployment resume.
That result would assess another condition: Applications recover through another authorized inspected path. The correct criterion is directly linked to the finding: APIC logs show authentication rejection despite network reachability.
Another proposed result is: Only intended application traffic traverses the load balancer. It would not independently establish the required outcome: Inventory sync and controlled network deployment resume.
Question 468
A Cisco ACI change review investigates: A Nutanix VMM integration stops updating workloads after its API credentials rotate. Observed evidence: APIC logs show authentication rejection despite network reachability. Which architectural or operational principle BEST applies?
Explanation
Correct Answer
Nutanix VMM integration depends on current controller authorization and correct host fabric-domain links. The recorded evidence is: APIC logs show authentication rejection despite network reachability. The corresponding action is: Update the least-privilege supported Nutanix VMM controller authentication.
Incorrect Answers
This alternative invokes: Recovery tests show gateway policy installation lagging the first VM boot. Appropriate ACI operational principle: VMM resolution and deployment immediacy settings balance pre-programming, first-packet readiness and resource use. The governing distinction for the recorded case is Nutanix VMM integration depends on current controller authorization and correct host fabric-domain links.
That principle concerns another fact pattern: APIC reports a VLAN allocation collision with an older virtual network. Appropriate ACI operational principle: VMM integration coordinates hypervisor controller inventory, EPG associations, access domains and valid encapsulation. Here the key fact is: APIC logs show authentication rejection despite network reachability.
A different principle is: The active EPG contract subject has no service graph association. Appropriate ACI operational principle: ACI service graphs require coherent L4-L7 device, connector and contract associations across intended traffic paths. The present evidence, however, is APIC logs show authentication rejection despite network reachability. The relevant rule is: Nutanix VMM integration depends on current controller authorization and correct host fabric-domain links.
Question 469
In a deliberately RELATED second view of the same fictional ACI problem: A Nutanix VMM integration stops updating workloads after its API credentials rotate. Which evidence-action-proof sequence is most defensible?
Explanation
Correct Answer
The case evidence indicates: APIC logs show authentication rejection despite network reachability. Apply the scoped action: Update the least-privilege supported Nutanix VMM controller authentication. Confirm its effect independently: Inventory sync and controlled network deployment resume.
Incorrect Answers
A different plan would inspect the observed evidence: The EPG lacks an association to its VMware vCenter VMM domain. Apply the controlled action: Correct the EPG-to-VMM-domain relation using supported APIC integration. Validate the separate result: The corresponding DVS port group appears and a VM attaches correctly. It does not test the case-specific condition: APIC logs show authentication rejection despite network reachability.
Another combination would inspect the observed evidence: Object dependencies show active applications still using the retiring VMM domain. Apply the controlled action: Migrate surviving associations before removing obsolete controller and domain records. Validate the separate result: Remaining workloads stay connected and the retired controller is absent. The current record instead supports Update the least-privilege supported Nutanix VMM controller authentication, verified by Inventory sync and controlled network deployment resume.
An alternative sequence would inspect the observed evidence: Graph state identifies the failed node while inspection remains a policy obligation. Apply the controlled action: Activate the approved service-node failover or redundancy design. Validate the separate result: Applications recover through another authorized inspected path. It has no direct link to the distinguishing evidence: APIC logs show authentication rejection despite network reachability.
Question 470
An ACI team must address: A Nutanix VMM integration stops updating workloads after its API credentials rotate. Which corrective action AND independent verification make the BEST pair?
Explanation
Correct Answer
The case evidence indicates: APIC logs show authentication rejection despite network reachability. Apply the scoped action: Update the least-privilege supported Nutanix VMM controller authentication. Confirm its effect independently: Inventory sync and controlled network deployment resume. For the current case, the offered answer is Update the least-privilege supported Nutanix VMM controller authentication. Independently observable proof: Inventory sync and controlled network deployment resume.
Incorrect Answers
Another potential sequence is: Align host uplinks with the intended supported VMM and access-domain relationships. Independently observable proof: The migrated VM remains classified into the correct ACI EPG. It has no direct link to the distinguishing evidence: APIC logs show authentication rejection despite network reachability.
Another action-and-check pairing is: Evaluate supported resolution pre-provision settings for required leaf network resources. Independently observable proof: Essential VMs obtain their expected initial connectivity after host recovery. The evidence here is APIC logs show authentication rejection despite network reachability. The required action and proof are Update the least-privilege supported Nutanix VMM controller authentication and Inventory sync and controlled network deployment resume.
A different plan would validate the new controller certificate and supported authenticated VMM connection. Independently observable proof: APIC resumes VMware DVS inventory and policy synchronization. It does not test the case-specific condition: APIC logs show authentication rejection despite network reachability.
Designing, Deploying, and Managing Network Automation Systems (350-901) Practice Tests
- Cisco 350-901 Practice Test 45 - 10 Questions (Last Reviewed 04-Oct-2026)
- Cisco 350-901 Practice Test 46 - 10 Questions (Last Reviewed 03-Oct-2026)
- Cisco 350-901 Practice Test 47 - 10 Questions (Last Reviewed 02-Oct-2026)
- Cisco 350-901 Practice Test 48 - 10 Questions (Last Reviewed 01-Oct-2026)
- Cisco 350-901 Practice Test 49 - 10 Questions (Last Reviewed 30-Sep-2026)